You don't have javascript enabled. Good luck with that.
Pencarian
Grebek Lumpur di Gang Macan Rampung
.
photo Rudi Hermawan - Beritajakarta.id

Channel Dredging Work on Gang Macan Completed

Channel dredging which carried out on Gang Macan, RT 10/01, Kedoya Utara, Kebon Jeruk has completed.

Dredging is carried out to anticipate inundation and flooding, and now it is completed

Kedoya Utara Urban Village Head, Tubagus Masarul Iman mentioned, West Jakarta Water Resources (SDA) Sub-agency personnel has started dredging work since September 31.

"Dredging is carried out to anticipate inundation and flooding, and now it is completed," he said, Monday (10/19).

SDA Personnel Clean Channel on Jl. Kesatriaan 8 Kebon Manggis

This channel has length of 250 meters, width of 100 centimeters, and depth of 200 centimeters.

As many as 30 SDA Sub-agency were deployed to dredge it. Every day, they collected 300 sacks full of mud sedimentation and garbage from the channel.

"Total we have collected 4,400 sacks full of mud and garbage. I hope residents can take a part in maintaining cleanliness of the channel," he asserted.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye255 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye254 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik